Production halls MN-Projects
- Home
- Production halls MN-Projects
Current production hall
- Slides: 2 × 5 tonnes (height to hook: 6 m)
technical equipment
- Plasma cutting machines
- Band saws, milling machines, drilling machines
- Professional assembly and welding tables
- Fronius TransSteel 4000 welding machine
- Miller Proheat 35 induction heating systems
- Positioners, rotators and specialised production machines
surfaces




surfaces
New production hall
- Slides: 10 to 40 tonnes (height to hook: up to 10 m)
It will be equipped with state-of-the-art machinery suitable for large-scale prefabrication.
It is designed for projects in the offshore, oil & gas and industrial infrastructure sectors.
Fast and efficient project implementation
Strategic location and logistics
-
Direct access from the S7 expressway
(Gdańsk – Kraków) - Proximity to motorways A1, A2 i A4
- Access to main rail routes
- Large-scale transport possible
- Central location in Poland - optimisation of costs and delivery times
- Rapid distribution to major seaports and customers throughout Europe
Production capacity
MN-Projects specialisation includes the prefabrication and manufacture of steel structures for the sectors:
- Offshore Wind (offshore wind farm foundation components, mounting systems)
- Oil & Gas (heavy lift structures, pipelines)
- Energy and industry (industrial installations, energy facilities)
- Large-scale prefabrication for infrastructure and heavy industry
key projects implemented
- Gode Wind 3 prefabrication of Noiseless system components
- Baltic Power production of 76 sets of Airtight Platform Rings
-
Baltic Power OSS
prefabrication of J-Tubes slides
In addition, our qualified welding and supervision staff perform on-site engineering and welding services for clients of marine foundation manufacturers (Monopoles) in Europe. We specialise in the installation and arming of these foundations.
Experience in demanding projects
MN-Projects has completed projects for leading marine foundation manufacturers (Monopiles), including:
- GODEWIND 3
- BORKUM 3
- REVOLUTION 2
- BALTIC POWER / OSS
- SUNRISE
- OCEAN WIND
- SOFIA
- THOR
All production processes are carried out in accordance with international standards:
ISO 9001
quality management
ISO 14001
environmental management
ISO 45001
BHP
EN ISO 3834-2
quality requirements for welding
EN 1090-1 / EN 1090-2 EXC4
manufacture of first-class steel structures
Safety quality systems
- continuous monitoring of production processes
- Audited health and safety procedures
- System LMRA (last minute risk assassment)
- Full technical and acceptance documentation
The ideal business partner
Discuss opportunities for collaboration and large-scale production for your project.
